FINAL
MOORING
ARRIVAL CHECKLIST
BELOW
- Radio off.
- Head and forward cabin doors latched.
- Head switched to holding tank.
- Hatches and ports closed and dogged.
- Holding tank through-hull valve closed.
- Drawers and compartments closed and latched.
- Saloon dinette table stowed properly.
- Life jackets stowed.
- Carry-aboard items retrieved.
- Pockets filled.
- Trim cheat sheet in log book.
- Galley secure:
- All burners off.
- Oven off.
- Gimbals as desired.
- Trash can emptied.
- Bilge empty.
- Kit bag:
- Air horn.
- Winch handle.
- Bilge pump handle.
- Engine key.
- Hatch boards in cockpit.
- Cabin lights off.
- Breakers off.
- Batteries off or switched to single.
- Unnecessary power off.
COCKPIT AND DECK
- Lines and sheets coiled.
- Halyards tied off.
- Mainsail covered.
- Mainsheet secured.
- Jib furler and sheets cleated.
- Engine controls covered.
- Instruments covered.
- Cockpit compartments empty.
- Cockpit cushions stowed.
- Heaving line retrieved.
- Life jackets retrieved.
- Scanner retrieved.
- China-marker note board retrieved.
- Main CNG valve off unless time to cook.
- Sunshower placed on deck.
- Dinghy tied off.
- Hatch locked.
- Anchors secured.
- Mooring lines cleated.
FINAL
- Float plan cancelled.
- Pink copy of checkout sheet returned.